About Us | Contact US | Employee Portal
Our Projects cont.
Project Title: Remedial Investigation Feasibility Study Keywords: Remedial Investigation/Feasibility Study
Client: U.S. Army Corps of Engineers Huntsville, AL Location: Akron, OH
Description: A Remedial Investigation / Feasibility Study (RI/FS) was conducted at the Summit Equipment Supply Company site, a former salvage yard that stored and reconditioned material/equipment, such as large electrical transformers. The RI/FS consisted of site characterizations, field surveys, soil, groundwater, and surface water sampling activities, installation of monitoring wells, and risk assessment activities. Throughout the ongoing project sampling activities, IntelliTech provided expert comprehensive data assessment and analytical support services to ICI (the primary contractor selected by the U.S. Army Corps of Engineers) utilizing Contract Laboratory Program (CLP) guidelines. Additionally, IntelliTech assisted in the preparation and review of required Health & Safety documents, preliminary project work plans, and sampling plans. Based on the superior services provided by the on this project, follow-on work was awarded. The follow-on work consisted of additional field investigations, soil and groundwater sampling activities, the development of remediation alternatives, and data assessment & validations efforts.

Previous Page   ~    Next Page